The apollo2 Diaries
Ken Mattingly was moved through the aid crew into parallel instruction with Anders as backup CMP in the event that Apollo 11 was delayed previous its supposed July launch date, at which place Anders could be unavailable.[fifty nine]Upon arrival within the Vertical Assembly Creating, Each individual stage was inspected in the horizontal situation be